by: Marko Bulic
STEEL
STRUCTURE ERECTION
1. BASIC MAN HOURS - UNIT
1.1 SORTING THE STRUCTURE
1.2 PRE-ERECTION OF STRUCTURE
1.3 TRANSPORT OF STRUCTURE TO ERECTION PLACE
1.4 INSTALLATION OF ANCHOR BOLTS
1.5 STRUCTURE ERECTION
1.6 INSTALLATION OF LOST FORMWORK
1.7 INSTALLATION OF WIRE ROPE CLAMPS
1.8 REAMING OF HOLES
1.9 BOLTING FROM SCAFFOLDING
2. ERECTION OF MISCELLANEOUS STEEL STRUCTURES.
2.1 BASIC MANHOUR RATES
3. CORRECTION FACTORS
4. STEEL STRUCTURES IN OIL REFINERIES AND PETROCHEMICAL PLANTS
4.1 LIGHT STRUCTURE (to 30 kg/m)
4.2 MEDIUM-WEIGHT STRUCTURE (31 ÷ 60 kg/m)
4.3 HEAVY STRUCTURE (above 60 kg/m)
4.4 MISCELLANEOUS STRUCTURES
4.5 PIPE HANGERS AND SUPPORTS
5. ERECTION AND DISMANTLING OFMISCELLANEOUS STEEL STRUCTURES
5.1 ERECTION OF STEEL STRUCTURES - ACC. TO THE WEIGHT
5.2 MISCELLANEOUS STRUCTURES
5.3 REMOVAL OF STEEL STRUCTURE AND MISCELLANEOUS ITEMS
see also
piping above ground
pipelines
steel structures
process equipment
storage tanks cylindrical and
spheroidal
welding and flame cutting
corrosion protection
thermal insulation
estimates
piping above ground estimate
points for build-in items
weihgt factors
tehnical calculation manners of data
compiling
man hours for overhauls inpetrocemical
plants
factors and man hours for piping
and steel structure works in call for tenders of "tchnip" companx
appendix of man hour manual